Home
Project Information
Project ID:
CAR1076
ARB ID:
CALS5074
Offset Project Operator:
CSE Operating I, LLC
Authorized Project Designee:
None
Project Name:
CSE Arizona Facility
Project Description:
A non-mechanical covered in-ground anaerobic digester has been installed to capture and destroy methane emanating from a previously uncovered dairy lagoon. The lagoon is not required to be covered by any state, national or local regulations. The bio-gas is used to generate electricity. The power is sold to a local utility under an agreement which does not include the green attributes. A back-up flare has also been installed.
Project is Being Transferred From Another Registry:
No
Crediting Period:
Initial
Project Type:
Livestock - ARB Compliance
Project Commencement Date:
5/25/2011
Project Reporting Start Date:
1/1/2013
Project Website:
Project Site Location:
Buckeye, Arizona
State/Province:
ARIZONA
Country:
US
Project Status:
Completed
Crediting Period Expires:
3/31/2023
Project Listed Date:
07/01/2014
Project Registered Date:
03/23/2015
Verification Bodies:
Documents:
View
Version 35.0