Home
Project Information
Project ID: CAR1298
ARB ID: CALS5398
Offset Project Operator: Adirondack Farms, LLC
Authorized Project Designee: Camco Offsets I, LLC
Project Name: Adirondack Farms
Project Description: The Adirondack Farms Livestock Project is a complete mix digester and biogas capture system that was built to capture the biogas from dairy manure, which would have been stored in an uncovered anaerobic lagoon prior to project implementation. The biogas that is captured from the digester system is used to generate electricity through one generator. Any excess biogas not combusted by the gen-set is combusted in an enclosed flare. Biogas produced by the digester is monitored continuously using biogas flowmeters.
Project is Being Transferred From Another Registry: No
Crediting Period: Initial
Project Type: Livestock - ARB Compliance
Project Commencement Date: 6/13/2017
Project Reporting Start Date: 11/3/2018
Project Website:
Project Site Location: Peru, NY
State/Province: NEW YORK
Country: US
Project Status: Registered
Crediting Period Expires: 5/31/2028
Project Listed Date: 03/27/2018
Project Registered Date: 07/30/2019
Verification Bodies:
Documents: View
Version 35.0
The Reserve - Powered by APX Technology